Waste Incinerator Operation Room, inside with waste incinerator and if necessary, there will be a waste storage room beside.
Incinerator testing fire in factory. The secondary chamber burn first and now what you see is primary chamber. This model is TS50.
The pet animal cremation picture above is dog cremation. The dog weight is 15-20 kgs per hour, after burning 1 hour the dog material is black colour, there is some remain and continue burn 0.5 hour later, the material is white, that’s mean all material burn out. Generall, the combustion chamber temperature is 700-950 degree […]
Incinerator Temperature Thermocouple, probe inside smoke temperature in the combustion chamber.