The strain will be elevated gradually in addition to steadily up until the defined examination pressure is gotten to that pressure will be maintained for a period sufficient time to allow a comprehensive examination to be made to make certain that the tank is sound enough and discloses no leakages or excessive distortion. The storage […]
*Double combustion chambers *Smoke filter chamber and S.Steel chimney *Italy Riello Oil burner and PLC Auto. control *Heavy duty mobile trailer with safe parts *Minimal installation *Mobile by truck tractor 1. Should be Trailer mounted Trailer Type 2. Be able to burn Medical waste 100-200kgs per hour 3. Diesel diesel oil type 4. 220 V single phase […]
is instilled and also full burning is reached. Solitary Chamber Excess Greater than an adequate amount of air (as high as 50% more than the amount On the surface supplied gas in addition to power are needed for the heaters along with forced air ventilation. A correctly running double- room controlled air system will definitely […]
Incinerator Rated Capacity: 100/KG/Hr Type of Design: Double Chambered Mode of Heating: Heating Elements Primary Combustion Chamber Waste Charging Door: Provided with refractory lining with sealing gaskets Ash Removed Door: Provided with refractory lining with sealing gaskets Outer Body MOC: Mild Steel, 5mm Primary Chamber: Stainless Steel Operating Temperature :800. ± 50◦C Insulation: Insulation Brick Heating Elements Type: Kanthal Al Grade Power Consumption: 75 KW ( Initial Load ) Electrical Supply :3 Phase 440 Volt Control Panel MOC: Mild Steel Power Coated No. of Temp: Controllers : 2 Nos Details: The Control Panel will be provided with contract as relays , switches , indicators etc . Operative on 3 phase. I.D.Fan Type: Centrifugal Type MOC: Mild Steel Capacity:2 HP/3Phase Make of Motor: Kirloskar /Havells/Crompton Combustion Air Fan Type: Centrifugal Type Capacity: 1HP/3Phase Make of Motor: Kirloskar /Havells/Crompton Stack: Type: Wire Supported MOC: Mild Steel of ISstd Height :3 Meters or more
The Professional will supply a Cremation System package for 2 (02) Cremators as well as system licensed by associated authority, which will need to match the alloted area as shown on the plan drawings. As a consequence of the financial condition in Bulgaria presently, our researches programs that a 100kg/hour system can match the demands […]
If, the equipment needs to be self-steam creating Medical Waste therapy system
Requires of Heater 1. Need to have prep work, Incineration, Scrubber activities to thaw waste totally as well as likewise waste gas have to be non-polluted 2. Ash must be just 5 percent of this waste material 5. our daily waste created from all sources is 0.55 kg/bed/day =685kg/day we need a burner of 150kg/hour […]
Medical Waste Incinerator Purpose For a complete destruction of waste from various hospital services by heat treatment of high temperature in accordance with EU standard on emission requirement. -Waste from health care activities -Infections waste, laboratory cultures, waste form operation room isolations material in contact with infected patients, waste potentially being infected by pathogenic agents. -Pathological waste, human fragments, blood, fetus, all body fluids, human tissues. -Sculpts, needles, infusion sets, blades, glass -Pharmaceutical waste. -Chemical waste laboratory reagents, disinfectants -Expired drugs. -Low radiation radioactive element. Medical waste incinerator: – Ecological Requirement – No odor -No fume -Definitive treatment of waste Medical waste incinerator: – Manufacturing Standards -UL,CE, ASME, ISA EURO emission standard 1.Medical waste incinerator Construction – CS plate shells, FB reinforcement, cast refractory linings, Insulation and 14 gage aluminum jacket. Type of fuel – Oil fired (Diesel) Burning Capacity – 250kg/hr and moisture up to 80%. Duration -8-16/Continuous Average fuel consumption – Very little as much as possible Control Type – PLC based operation Operating Temperature – Primary chamber 800oc ± 50 – Secondary Chamber 1050oc ± 50 Size of incinerator – Not more than 15mx7.20m Chimney – Ø630x25meter height and 7mm thick CS. Combustion efficiency- 99% Mode of waste handling- Semi-automatic via ram loader. Mode of ash handling – Semi-automatic via grate and ash trolley. Pollution control equipment- Dry settlement zone Doors- 1-waste charging door in primary chamber 1-clinker door in primary chamber 1-ash trolley access door in primary chamber 1-clean out door in secondary chamber Burner – 2- ignition burner in primary chamber 2- after burner in secondary chamber. Type- package mono block-fully automatic Type of burner operation- modulation control Forced draught fan- 1-primary air fan 1-secondary air fan Fuel storage tank – Capacity- 2500liter above ground – Material-6mm thick mild steel – 2-diesel pump, gate valve, safety valve, strainer Pipe, pressure gage, check valve, control board Level indicator. Etc Refractory/insulation thickness- not less than 225mm Ram loader capacity- 0.75m3 Electrical supply- 380v/3ph/50 Hz Finish and painting type- powder coated Audio/ visual alarm system- burner lockout, overload fault Electrical accessories- primary and secondary chamber temperature […]
Australian burning style exclusive 5 25kg/hour double room ( LPG) burner or equal approved. Burner casing to be light steel with 125mm refractory liner containing essential and second room, secure draft area above second room, package burners, digital temperature level control systems, ash rake as well as poke, 2nd door in primary room, hands on […]
Key Features: * All models with Dual combustion chamber. * Stainless Steel chimney/stack, long life. *according to sequence * High fever, long life of incinerator. * Free or minimal installation on site. * High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day. *according to order * New Design for pet […]