Medical Waste Incinerator Purpose For a complete destruction of waste from various hospital services by heat treatment of high temperature in accordance with EU standard on emission requirement. -Waste from health care activities -Infections waste, laboratory cultures, waste form operation room isolations material in contact with infected patients, waste potentially being infected by pathogenic agents. -Pathological waste, human fragments, blood, fetus, all body fluids, human tissues. -Sculpts, needles, infusion sets, blades, glass -Pharmaceutical waste. -Chemical waste laboratory reagents, disinfectants -Expired drugs. -Low radiation radioactive element. Medical waste incinerator: – Ecological Requirement – No odor -No fume -Definitive treatment of waste Medical waste incinerator: – Manufacturing Standards -UL,CE, ASME, ISA EURO emission standard 1.Medical waste incinerator Construction – CS plate shells, FB reinforcement, cast refractory linings, Insulation and 14 gage aluminum jacket. Type of fuel – Oil fired (Diesel) Burning Capacity – 250kg/hr and moisture up to 80%. Duration -8-16/Continuous Average fuel consumption – Very little as much as possible Control Type – PLC based operation Operating Temperature – Primary chamber 800oc ± 50 – Secondary Chamber 1050oc ± 50 Size of incinerator – Not more than 15mx7.20m Chimney – Ø630x25meter height and 7mm thick CS. Combustion efficiency- 99% Mode of waste handling- Semi-automatic via ram loader. Mode of ash handling – Semi-automatic via grate and ash trolley. Pollution control equipment- Dry settlement zone Doors- 1-waste charging door in primary chamber 1-clinker door in primary chamber 1-ash trolley access door in primary chamber 1-clean out door in secondary chamber Burner – 2- ignition burner in primary chamber 2- after burner in secondary chamber. Type- package mono block-fully automatic Type of burner operation- modulation control Forced draught fan- 1-primary air fan 1-secondary air fan Fuel storage tank – Capacity- 2500liter above ground – Material-6mm thick mild steel – 2-diesel pump, gate valve, safety valve, strainer Pipe, pressure gage, check valve, control board Level indicator. Etc Refractory/insulation thickness- not less than 225mm Ram loader capacity- 0.75m3 Electrical supply- 380v/3ph/50 Hz Finish and painting type- powder coated Audio/ visual alarm system- burner lockout, overload fault Electrical accessories- primary and secondary chamber temperature […]
hot medical waste disposing machine, Operation Condition: 8-16 hr/ day Control: Built-in data recording Operating temperature: Incinerator /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: continuous loading, Top Loading Capacity/Burn rate per hour: 250 -300 kg/hr Material: External- 3 layers Internal lining: a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shock Secondary Combustion Chamber: Type: horizontal/vertical Temperature: 1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment system : Capable of treating the flow of flue gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc Auxiliary device: Fuel cut-off device Waste feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time Chimney (Stack): Type: Vertical type height:>7 meter’ Material: Fireproof cast, stainless steel OUTPUT: GAS- SMOKELESS,ODORLESS ASH -Max <5% of original waste size Reduction of Pollutant gas SO2, HCL, HF and line particulate Emission standard: WHO/ European Test report for emission testing provided? Heat exchange mode: Automatic Accessories: All standard accessories for incinerator, including but not limited to loading system, heat exchangers, pollution control system, ash removal system, including ladder and oil tanker (2500litre capacity). Operating Environment: The incinerator is capable to operate at the altitude of 2400mt above sea level. (according to the site conditions) Power Requirement: 220 Vac single phase or 380 Vac three phase 4 wire system 50HZ Installation Testing and Commissioning : to be conducted by certified or qualified personnel. Supplier shall provide the following documentation User (Operating) manual in English. Service (Technical / Maintenance) manual in English. Certificate of calibration and inspection from factory. Fast moving spare parts: Supplier is able to provide fast moving spare parts with quantities as described in the price schedule or their equivalent. Training: Supplier is able to provide training on operation, management and maintenance of incinerators. Warranty Comprehensive warranty for minimum 2 year. Maintenance Service during Warranty Period During warranty period supplier must ensure, corrective/breakdown maintenance whenever required. Supplier has a local agent or branch office in Ethiopia (please indicate the name and contact details of the agent) Supplier provides labor, lifting equipment and tools needed for the installation, testing and commissioning of the incinerator. The supplier will be responsible for the safety of its staff, workers and laborers during the installation, testing & commisssioning Able to provides all necessary information that would be used as an input for preparation of floor (platform) and room for the incinerator to be supplied such as the following; Lay outs (drawings) and pictures of the incinerators to be installed […]
The permit that allows the Radford Army Ammunitions Plant to burn hazardous waste from firearms outdoors is up for renewal. Community activists see an opportunity to address environmental and health concerns about the open burning – and state regulators see a chance to explore new technology to solve an old problem. Just a handful of […]
Informations de base. Marchés d’exportation: mondiaux Information additionnelle. Marque Déposée: Clover Description du produit Nanjing Clover Medical Technology Co., Ltd. est l’un des principaux fabricants d’incinérateurs de déchets en Chine. Nous sommes un fabricant local et l’un des plus grands exportateurs de Chine. L’équipement technique d’incinérateur pyrolytique est le principal traitement des déchets dans le […]
animal incinerator prices according to the capacity or the size want to cremation. The pet cremation equipment humanized design with movable platform, small space covers for modern pet cremation business owner all over the world. Items/Model A1500 A2400 A4000 A5500 Burning Rate *animal 90 kgs/Hr. 150 kgs/Hr. 200 kgs/Hr. 400 kgs/Hr. Feed Capacity *animal 120 […]
Australian burning style exclusive 5 25kg/hour double room ( LPG) burner or equal approved. Burner casing to be light steel with 125mm refractory liner containing essential and second room, secure draft area above second room, package burners, digital temperature level control systems, ash rake as well as poke, 2nd door in primary room, hands on […]
Ngày 22 tháng 5 năm 2019 Tin tức ngành 421 lượt xem Nhiều người không biết bộ lọc quấn quanh là gì? Tại sao chúng ta cần sử dụng bộ lọc vết thương? Chúng tôi thường xuyên nhận được các cuộc gọi để hỏi về nguyên lý hoạt động, môi trường sử dụng và cách […]