Power in Denmark is increasingly being generated in plants burning waste imported from England. The practice is being called an economical and environmental boon on both sides of the equation. The AVØ incinerator in Frederikshavn produces heating and power for the area by burning trash from England. “It is mainly construction waste like pieces of […]
Researchers at the University of York have concluded that PyroPure (UK) technology has the potential to transform the way in which hazardous waste is destroyed in clinical environments and say pharmacists, manufacturers and hospitals throughout the UK should consider trialling the system. The announcement follows a six month Innovate UK-funded Knowledge Transfer Partnership project in […]
Supply, Installation and Commissioning of DIESEL FIRED INCINERATORSMedical Waste Incinerator, 100 to 120 Kg/hrApplication For incineration, general and pathologicalCapacity 100 C 120 kg/h burn rateType Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unitOperating time Minimum 8 hours dailyOperating temperature From 850 0C to 1200 0C, Automatic controlledResidual Ash 5 to 10%Construction Constructed from heavy duty mild or aluminized steelOr equal and approved equivalent Insulation material Refractory material lining similar or equal to calcium Silicate and hot face combination of heavy duty brickworkInternal Construction Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory materialCharging Door Suitable for manual loading of wastes and with smooth Dear seal equivalent of Ceramic seals with hinges.Door Lock Automatic, Electric typeAsh removal door Provided, for removing resultant bottom ash leftovers from the Primary chamberGratings ProvidedLoading Manual loading of wastePrimary Burner Fully automatic, with fuel, temperature and speed controls with ignition system flame detector Air fan Complete with safety features, flame failure Diesel fired fuel injector type Flange mountedBlower Provided. 3 phase for supplying excess combustion air through the distribution system with speed control systemTemperature Minimum exit 850 0CObservation port To be provided with protective glass type 3.3 Secondary chamber
Metro Vancouver is taking more heat over its plan to build a second garbage incinerator, with a new study commissioned by waste company Belkorp Environmental Services suggesting the move could cost up to $1.3 billion more than originally estimated. The analysis, conducted by ICF International on behalf of Belkorp, comes as Metro Vancouver attempts to […]
Supply, Installation and Commissioning of DIESEL FIRED INCINERATORSMedical Waste Incinerator, 100 to 120 Kg/hrApplication For incineration, general and pathologicalCapacity 100 C 120 kg/h burn rateType Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unitOperating time Minimum 8 hours dailyOperating temperature From 850 0C to 1200 0C, Automatic controlledResidual Ash 5 to 10%Construction Constructed from heavy duty mild or aluminized steelOr equal and approved equivalent Insulation material Refractory material lining similar or equal to calcium Silicate and hot face combination of heavy duty brickworkInternal Construction Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory materialCharging Door Suitable for manual loading of wastes and with smooth Dear seal equivalent of Ceramic seals with hinges.Door Lock Automatic, Electric typeAsh removal door Provided, for removing resultant bottom ash leftovers from the Primary chamberGratings ProvidedLoading Manual loading of wastePrimary Burner Fully automatic, with fuel, temperature and speed controls with ignition system flame detector Air fan Complete with safety features, flame failure Diesel fired fuel injector type Flange mountedBlower Provided. 3 phase for supplying excess combustion air through the distribution system with speed control systemTemperature Minimum exit 850 0CObservation port To be provided with protective glass type 3.3 Secondary chamber
hot medical waste disposing machine, Operation Condition: 8-16 hr/ day Control: Built-in data recordingOperating temperature: Incinerator /Primary Combustion ChamberPrimary Chamber: 900 – 1200 0C Type: continuous loading, Top LoadingCapacity/Burn rate per hour: 250 -300 kg/hr Material:External- 3 layers Internal lining: a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shockSecondary Combustion Chamber:Type: horizontal/verticalTemperature: 1200- 1300 oCResidence time of gases : >2 secondsAsh Residue: <5% of original waste sizeAsh Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ashFlue gas treatment system : Capable of treating the flow of flue gas as the incinerator is operating at its maximum capacityAuxiliary device: Water level gauge, pressure sensor, PH sensor..etc Auxiliary device: Fuel cut-off deviceWaste feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time Chimney (Stack):Type: Vertical typeheight:>7 meter’Material: Fireproof cast, stainless steelOUTPUT: GAS- SMOKELESS,ODORLESS ASH -Max <5% of original waste sizeReduction of Pollutant gas SO2, HCL, HF and line particulateEmission standard:WHO/ EuropeanTest report for emission testing provided?Heat exchange mode: Automatic Accessories: All standard accessories for incinerator, including but not limited to loading system, heat exchangers, pollution control system, ash removal system, including ladder and oil tanker (2500litre capacity).Operating Environment: The incinerator is capable to operate at the altitude of 2400mt above sea level. (according to the site conditions)Power Requirement:220 Vac single phase or 380 Vac three phase 4 wire system 50HZ Installation Testing and Commissioning : to be conducted by certified or qualified personnel. Supplier shall provide the following documentation User (Operating) manual in English. Service (Technical / Maintenance) manual in English. Certificate of calibration and inspection from factory. Fast moving spare parts: Supplier is able to provide fast moving spare parts with quantities as described in the price schedule or their equivalent. Training: Supplier is able to provide training on operation, management and maintenance of incinerators. Warranty Comprehensive warranty for minimum 2 year. Maintenance Service during Warranty Period During warranty period supplier must ensure, corrective/breakdown maintenance whenever required. Supplier has a local agent or branch office in Ethiopia (please indicate the name and contact details of the agent) Supplier provides labor, lifting equipment and tools needed for the installation, testing and commissioning of the incinerator. The supplier will be responsible for the safety of its staff, workers and laborers during the installation, testing & commisssioning Able to provides all necessary information that would be used as an input for preparation of floor (platform) and room for the incinerator to be supplied such as the following; Lay outs (drawings) and pictures of the incinerators to be installed Length, width and height of incinerator, Area (length x width) for the floor (platform) and Length, width and height for roofing, for each type of incinerators to be installed Needs during the transport, installation, assembly, commissioning and operation of the equipment in terms of access points, available space to operate (inside and outside of the room), ways to get to the site where the equipment will be placed or any others. ; Technical Specifications (fuel consumption rat e, weight, anchoring system, support points, etc.); Chimney specifications to be used for the roof design ( size, support needs, insulation); Considerations related to operation and Maintenance, for e.g., minimum available area to perform routine maintenance tasks and replacement of key parts that need to be changed more frequently; Any consideration/need of the incinerator while being operated that might impact the design of the room/shelter where it will be placed.Other important information to be considered that can influence or impact the designing and building processes of the infrastructure for the incinerators, for example area dimension for other accessary parts like fuel tanker storage, if applicable, etc…. Delivery time (DAP, Addis Ababa) in weeksName of manufacturer including website of the manufacturer &/ supplier & country of origin
Among them,tn, the steel industry produced two? English number is much higher than normal number of waste incineration. � stone hillsIncineration plant turned landscapeIn recent years, with advances in technology, incineration, waste incineration plants living abroad to implement a large-scale restructuring, through higher environmental standards to transform the old incinerator, off a small plant, built […]
PESHAWAR: Even with clear rules which state hospital waste must be incinerated within 24 hours of its collection, incinerators at two major hospitals in Khyber-Pakhtunkhwa (K-P) are out of order and the waste is dumped outside the hospitals. According to data collected by the Environmental Protection Agency (EPA), 15 to 20 tons of hospital waste […]
hot medical waste disposing machine, Operation Condition: 8-16 hr/ day Control: Built-in data recordingOperating temperature: Incinerator /Primary Combustion ChamberPrimary Chamber: 900 – 1200 0C Type: continuous loading, Top LoadingCapacity/Burn rate per hour: 250 -300 kg/hr Material:External- 3 layers Internal lining: a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shockSecondary Combustion Chamber:Type: horizontal/verticalTemperature: 1200- 1300 oCResidence time of gases : >2 secondsAsh Residue: <5% of original waste sizeAsh Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ashFlue gas treatment system : Capable of treating the flow of flue gas as the incinerator is operating at its maximum capacityAuxiliary device: Water level gauge, pressure sensor, PH sensor..etc Auxiliary device: Fuel cut-off deviceWaste feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time Chimney (Stack):Type: Vertical typeheight:>7 meter’Material: Fireproof cast, stainless steelOUTPUT: GAS- SMOKELESS,ODORLESS ASH -Max <5% of original waste sizeReduction of Pollutant gas SO2, HCL, HF and line particulateEmission standard:WHO/ EuropeanTest report for emission testing provided?Heat exchange mode: Automatic Accessories: All standard accessories for incinerator, including but not limited to loading system, heat exchangers, pollution control system, ash removal system, including ladder and oil tanker (2500litre capacity).Operating Environment: The incinerator is capable to operate at the altitude of 2400mt above sea level. (according to the site conditions)Power Requirement:220 Vac single phase or 380 Vac three phase 4 wire system 50HZ Installation Testing and Commissioning : to be conducted by certified or qualified personnel. Supplier shall provide the following documentation User (Operating) manual in English. Service (Technical / Maintenance) manual in English. Certificate of calibration and inspection from factory. Fast moving spare parts: Supplier is able to provide fast moving spare parts with quantities as described in the price schedule or their equivalent. Training: Supplier is able to provide training on operation, management and maintenance of incinerators. Warranty Comprehensive warranty for minimum 2 year. Maintenance Service during Warranty Period During warranty period supplier must ensure, corrective/breakdown maintenance whenever required. Supplier has a local agent or branch office in Ethiopia (please indicate the name and contact details of the agent) Supplier provides labor, lifting equipment and tools needed for the installation, testing and commissioning of the incinerator. The supplier will be responsible for the safety of its staff, workers and laborers during the installation, testing & commisssioning Able to provides all necessary information that would be used as an input for preparation of floor (platform) and room for the incinerator to be supplied such as the following; Lay outs (drawings) and pictures of the incinerators to be installed Length, width and height of incinerator, Area (length x width) for the floor (platform) and Length, width and height for roofing, for each type of incinerators to be installed Needs during the transport, installation, assembly, commissioning and operation of the equipment in terms of access points, available space to operate (inside and outside of the room), ways to get to the site where the equipment will be placed or any others. ; Technical Specifications (fuel consumption rat e, weight, anchoring system, support points, etc.); Chimney specifications to be used for the roof design ( size, support needs, insulation); Considerations related to operation and Maintenance, for e.g., minimum available area to perform routine maintenance tasks and replacement of key parts that need to be changed more frequently; Any consideration/need of the incinerator while being operated that might impact the design of the room/shelter where it will be placed.Other important information to be considered that can influence or impact the designing and building processes of the infrastructure for the incinerators, for example area dimension for other accessary parts like fuel tanker storage, if applicable, etc…. Delivery time (DAP, Addis Ababa) in weeksName of manufacturer including website of the manufacturer &/ supplier & country of origin
Patients with this debilitating virus produce 440 gallons of medical waste daily, including instruments, gowns, gloves, body fluids, sheets, mattresses and more. That’s a substantial amount of medical waste in any situation, but it’s especially daunting in this case because it needs to be disposed of extremely cautiously, to avoid the risk of spreading infection. […]