waste incinerator 每天更新 ⋅ 2019年8月10日 新闻 Is a trash crisis looming in Md.? WTOP The closure of these incinerators, which consume 98% of the trash burned in the state, would have a dramatic effect. The Wheelabrator plant in … 标记为不相关 Incinerator will accept animal waste at no cost Skagwaynews 1 unanimously approved a resolution to allow […]
waste incinerator 每天更新 ⋅ 2019年8月9日 新闻 Dutch poised to halt importing waste due to crisis at AEB incinerator DutchNews.nl The AEB, which was touted as the most innovative waste incinerator complex in the country in 2006, and which also provides city heating for 35,000 … 标记为不相关 INSIGHT: Don't Incinerate Waste; Get Circular, Optimize Plastics Bloomberg Environment […]
waste incinerator 每天更新 ⋅ 2019年8月8日 新闻 Waste-to-Energy waste360 … Opposes North London Waste Incinerator. Opponents fear the incinerator will contribute to climate change and add to London's pollution levels. 标记为不相关 This Week in History 8/8/19 Clay Today Online Clay County Administrator Robert Taylor requests a public hearing on a proposed permit for a biological waste […]
diesel Fuel incinerators 16. The supplier must provide necessary information for the best of the installation. This incinerator with “PYROLYTIC” combustion must have: 17. A combustion chamber of waste: Perfectly tight door for the manual loading of waste. The loading should be manual, batch load. A burner of lighting which the use is limited to the ignition of waste. Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating out of refractory. The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminium and insulates bricks in order to assure a minimum temperature on the outside sheet metal. Composition of the refractory; Refractory concrete: Thickness :>100mm Nature: 42% of Al203 Insulate in fibrous panels: Thickness: >75mm Nature: Calcium silicate. Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve. Plate of combustion in Carborundum, avoiding the fixing of glass and slags. 18. A chamber of post combustion of gases A burner of combustion of gases, A device of injection of air allowing a total re-combustion of gases, A device of air inlet of cooling of waste gases, A sheath of evacuation of the gases burnt, Carcass in strong sheet steel with support of connection Composition of the refractory; Refractory concrete: Thickness :>150mm Nature: 65%% of Al203 Insulate in fibrous panels: Thickness: >85mm Nature: Calcium Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve. A secondary injection of air to ensure perfect oxygen content.
HIGH TECH PYROLYTIC MEDICAL WEST INCINERATOR 1.Capacity of destruction in weight: 60Kg/h 2.It should be able to operate not less than 10 hours/day. 3.This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc.. 4.Design Specification: Types A, B, C, D and E of medical waste 5.”PYROLYTIC” combustion by controlling the gasification of waste. 6.The incinerator must avoid the release of black smoke and fine dust, (smokeless) during the loadings. 7.It should be able to reduce the volume of wastes by 98% 8.It should be able to hold emission in the second burn with gas residence of not less than 2 seconds. 9.The incineration should be completely free from visible smoke as well as offensive odours. 10. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg the temperatures of combustion: Minimum will be 850oC and max 1400oC post combustion:>1100oC 11. The internal diameter of the chimney:Ø400 and its height: 8m 12. The volume of the combustion chamber: 1,200L 13. The dimension of the door for loading in cm: 70 x 70 14. Burner operation should be automatic on/off
Incinerator should be smokeless, odourless combustion and it should be made by high-quality cast, insulation, and steel plate as well as minimum generation of dust. Moreover the incinerator should be corrosion resistant. Type Pyrolytic:- Hot Medical Waste Disposing Machine Operation Condition 8-16 Hr /day Controls Built in data recording Incinerator /Primary Combustion Chamber Type: continuous loading Capacity/Burn rate per hour: 250 -300kg/hr Temperature: 900-1200 oC Material: External- 3 layers Internal lining: a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or […]
SPECIFICATIONS OF A DIESEL FIRED INCINERATOR Incinerator type: Animal waste incinerator Load Capacity minimum: 1500 kg Burner fuel type: Diesel Burner fuel rate max.: 20-25 Liter diesel/ per hour Burners minimum: 3 Burning rate minimum: 200-300kg/per hour Furnace bar area minimum: 2 м3 Fuel tank capacity minimum: 300L Main chamber burning temperature min. 1100 0C Afterburner chamber burning temperature min. 1300 0C Power supply 220V Incinerator items and electrical appliances should be weather proof and humidity resistant within the range of 30-90 % Incinerator should be compliant to the environmental protection rules in accordance to national legislation Maximum dimensions C Length C 5m, width C 3.5m, height C 5m INCINERATOR, DIESEL, FIRED. Specifications Indicate if item offered complies with each specification. 1.1 General description The incinerator should be a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner. It should employ a temperature based logic control system to provide optimum control of the operating conditions and incorporate a high capacity thermal oxidizing secondary chamber. It should be designed to retain the exhaust gases, for at least 2 seconds to ensure the unit’s effective destruction of the combustion products. For the Supply, installation & commissioning of a Medical Waste Incinerator as detailed below: i. Waste type Health care waste ii. Waste density 125 to 350Kg/M3 iii.. Waste Calorific Value 4000 KCAL/Kg iv. Moisture content 10-25% v. Estimated ash residue 5-10% vi. Nominal capacity 50Kg/hour batch load vii. Secondary chamber 2 seconds @ 850°C viii. Environmental NEMA ACT (EMCA) 1999, Waste management regulations, 2006 […]
waste incinerator 每天更新 ⋅ 2019年8月7日 新闻 This Art Exhibit Shows How Our Culture Of Disposability Is Affecting The Environment WBUR One of the few moments of hope is offered by oil painter Madeline Lee, who chose to depict the Somerville Art Farm, a former waste incinerator site … 标记为不相关 Global Incinerator Market Outlook 2019-2027: Babcock & […]
Incinerator should be smokeless, odourless combustion and it should be made by high-quality cast, insulation, and steel plate as well as minimum generation of dust. Moreover the incinerator should be corrosion resistant. Type of incinerator : Pyrolitic – hot medical waste disposing machine Operation Condition: 8-16 hr/ day Control: Built-in data recording Operating temperature: Incinerator /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: continuous loading, Top Loading Capacity/Burn rate per hour: 250 -300 kg/hr Material: External- 3 layers Internal lining: a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shock Secondary Combustion Chamber: Type: horizontal/vertical Temperature: 1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment system : Capable of treating the flow of flue gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc Auxiliary device: Fuel cut-off device Waste feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time Chimney (Stack): Type: Vertical type height:>7 meter’ Material: Fireproof cast, stainless steel OUTPUT: GAS- SMOKELESS,ODORLESS ASH -Max <5% of original waste size Reduction of Pollutant gas SO2, HCL, HF and line particulate Emission standard: WHO/ European Test report for emission testing provided? Heat exchange mode: Automatic Accessories: All standard accessories for incinerator, including but not limited to loading system, heat exchangers, pollution control system, ash removal system, including ladder and oil tanker (2500litre capacity). Operating Environment: The incinerator is capable to operate at the altitude of 2400mt above sea level. (according to the site conditions) Power Requirement: 220 Vac single phase or 380 Vac three phase 4 wire system 50HZ Installation Testing and Commissioning : to be conducted by certified or qualified personnel. Supplier shall provide the following documentation User (Operating) manual in English. Service (Technical / Maintenance) manual in English. Certificate of calibration and inspection from factory. Fast moving spare parts: Supplier is able to provide fast moving spare parts with quantities as described in the price schedule or their equivalent. Training: Supplier is able to provide training on operation, management and maintenance of incinerators. Warranty Comprehensive warranty for minimum 2 year. Maintenance Service during Warranty Period During warranty period supplier must ensure, corrective/breakdown maintenance whenever required. Supplier has a local agent or branch office in Ethiopia (please indicate the name and contact details of the agent) Supplier provides labor, lifting equipment and tools needed for the installation, testing and commissioning of the incinerator. The supplier will be responsible for the safety of its staff, workers and laborers during the installation, testing & commisssioning […]
waste incinerator 每天更新 ⋅ 2019年8月6日 新闻 Indonesia returns seven containers of waste to France and Hong Kong South China Morning Post Contaminated trash is sent to incinerators and landfills for a fee, but some recyclers “just find a corner and burn it,” Wong said. “The smoke smells just … 标记为不相关 West Bromwich incinerator near M5 could […]