Category: Blogs

YD-500 1000-2000 kgs per feed 500 kgs per hour 2-4 hours 380V 2.24Kw Natural Gas or Diesel oil Italy Burner Manual 22.0-40.0 Kgs/Hour 20.0-45.0m3/Hour 320 x 220 x 460cm (mainbody) 257 x 147 x 108cm(Primary Chamber) 4000Liters 1500Liters 500 Liters 108 x 128cm 14.0M 13000kgs Firebrick ,Refractory Concrete  400,000Kcal/Hr. Medical waste incinerator,  approx. 0.4 cubic metres,  diesel fuel / mains power operated, thermostatic temperature control,  programmable cycle Emission Concentrations for Incinerator  Pollutant Incinerator Emission (Test conditions to be confirmed) Dust 76.7 mg/m3 CO 67.5 mg/m3 VOC   SO2 9.5 mg/m3 HCl 82.9 mg/m3 HF   NOx 153.9 mg/m3 Hg 0.000041 mg/m3 Cd 0.000010 mg/m3 As + Ni 0.052 mg/m3 Pb 0.359 mg/m3 Cr+Sn+Sb+Cu+Mn 0.196 mg/m3   […]
The Model is for up to 300kgs capacity per batch load and will burn at around 55kgs per hour.  The unit has top loading design and has a heavy duty refractory cement lining for maximum heat retention. Unit have large top lid for easy loading, and specially designed front ash door, for ash removal. This unit operates at over 1100°C in the primary chamber to ensure complete combustion. This model also benefits from a heavy duty secondary chamber and burner which ensures a complete re-burn of any smoke and emissions and a 0.5 second gas retention time. PRIMARY CHAMBER Heavy-duty steel casing High quality refractory lining and insulation Large full size top load door and liquid retention sill 1 x diesel oil fired ignition burners operated on/off SECONDARY CHAMBER Heavy-duty steel casing High quality refractory lining and insulation 1 x diesel oil fired ignition burners operated on/off CHIMNEY Heavy-duty stainless steel casing 1.5m length 0.6m refractory lined stack CONTROL PANEL Control of 1 burner Timer control 0- 12 hours Integral fan timer control Temperature Monitoring Thermostatic Control Automatic Control Cycle time set up ANCILLARIES Operating and maintenance manuals Spares list CONTAINERISATION incinerator fully installed inside of 10 ft ISO certified container 3,5 kwA electricity generator, 1000 litres fuel tank Incinerator mounted on the silenblock cushion.
waste incinerator 每天更新 ⋅ 2019年8月17日 新闻 Scrap Collector: Australia's recyclable export ban creates domestic opportunities — including … Waste Dive … material — and whether the announcement is "designed to distract from a major government push to burn Australia's waste in polluting incinerators.". 标记为不相关 Circular enerG lawsuit vs. town of Romulus to be argued Tuesday […]
waste incinerator 每天更新 ⋅ 2019年8月16日 新闻 Spanish and Belgian firms clinch £370m contracts for Aberdeen incinerator Energy Voice Spanish and Belgian firms have clinched a £370m deal to build and operate a new waste-to-energy plant in Aberdeen. The North East Scotland … 标记为不相关 Vancouver to hire pooch poo processor The Tri-City News The plastic bags go […]
incinerator 实时更新 ⋅ 2019年8月15日 网页 Moscow Trash Incinerator Spews Bright-Purple Smoke The Moscow Times A garbage incineration plant reportedly owned by the son of Russia's attorney general has been filmed spewing purple smoke on the eastern outskirts … 标记为不相关 查看更多结果 | 修改此快讯 您收到此电子邮件是因为您订阅了Google快讯。 退订 | 查看您所有的快讯 以RSS Feed的形式接收此快讯 发送反馈
waste incinerator 每天更新 ⋅ 2019年8月15日 新闻 New incinerator burning 200k tonnes of waste a year planned for Cardiff WalesOnline A new incinerator which could burn up to 200,000 tonnes of waste a year is being planned in Cardiff. The proposed £150million energy plant would be … 标记为不相关 Kakamega's Sh12m medical waste incinerator to serve Western The […]
incinerator 实时更新 ⋅ 2019年8月14日 网页 Waste to Energy Incineration Zero Waste Network Waste incinerators do not eliminate waste – in fact they generate it. Since physical matter cannot be destroyed, an incinerator actually transforms the … 标记为不相关 查看更多结果 | 修改此快讯 您收到此电子邮件是因为您订阅了Google快讯。 退订 | 查看您所有的快讯 以RSS Feed的形式接收此快讯 发送反馈
waste incinerator 每天更新 ⋅ 2019年8月14日 新闻 Smart plastic incineration posited as solution to global recycling crisis E&T Magazine With China refusing to receive plastic waste from developed countries, many people are agonising over possible alternative solutions. One expert is … 标记为不相关 Spanish contractor seals £180m Aberdeen waste plant job Construction Enquirer Aberdeen City, Aberdeenshire, and Moray […]
*External diameter at base 6ft 1.8m *External diameter at top 4 1/2ft 1.35m *Internal diameter at base 3ft 0.9m *Internal diameter at top 3ft 0.9m *Thickness of wall at base 18cm *Thickness of wall at top 9cm *Perpendicular height of wall 4ft *Height of Iron bars from grate above ground 1ft Material Required *Puddle swish *5 or 6 Iron bars about 4 1/2ft 1.35m long each *Quantity of large stones for foundation  *2 empty kerosene tins for making vent holes *2ltrs of coal tar *2 brushes *Foundation 1ft-1 1/2ft deep is dug *Filled with large stones and puddle swish to ground level  *Empty kero tins are next placed into position where the vent holes are to appear *Wall 1ft high is built with puddle swish *Iron bars are put in position leaving a space of about 2cm-3cm between the bars 4ft 1.2m to be reached *Wall plastered smooth  multiple diesel fuel combustion chambers Performance capacity 120kg/hr GRE 1.25 for HCRW 96kg/hr GRE 1.25 for general waste. 40kg/hr GRE 3.00 for plastic Waste type: health care risk waste and general waste Chimney stack Chimney: 3.5mm mild steel Height from base: 11m and if there are buildings within 30m of the incinerator, chimney must extend at least 3m above the apexes of all the roofs of such buildings Diameter of chimney at top: 430mm Weight of stack: ± 500kg case and stack be painted with 400 °C heat resistant black paint Burners 1st chamber 850 oC -900oC 2nd chamber 1000oC Variable speed combustion air blowers Primary chamber volume ±1.05 cubic metres Mixing chamber volume ±0.30 cubic meters Settling chamber volume ±0.89 cubic meters Weight excluding chimney ±6 400kg at manufacture Firing tools supplied: Hoe, poker and rake Dimensions Length ±2 125mm Width ±1 890mm Height  ±2 125mm Extra width for burners ±1 000mm Loading door opening 610mm×540mm Hearth area ±1.19 square metres Description of grate/hearth: A full hearth to be supplied to prevent contaminated  liquids  from  flowing  into  ash  pit  without  being […]
 Incinerator  300 kg/hr  Burn Capacity (min. 1200 kgs. Waste Feed Capacity per day) (Power Supply 380V, 50Hz, 3Ph)   Incinerator  450 kg/hr  Burn Capacity (min. 1800 kgs. Waste Feed Capacity per day) (Power Supply 380V, 50Hz, 3Ph)   Incinerator main unit main body (primary chamber, secondary chamber, mix-combustion chamber   Filter Chamber   Chimney   PLC Panel   Oil Tank   Combustion burner   Wind Tube   Oil Tube   Filter brick   Ash clean tool   Blower   Furnace gate   One bag chamber maintenance material  Feed Capacity 600-1200 kg per feed Burning Rate Min. 300 kgs per hour Burning Time per Feed 2-4 hours Voltage 380V Power 1.48Kw Frequency 50Hz Fuel Natural Gas or Diesel Oil Fuel Mode Manual Fuel Consumption (Oil) Max 40 kgs per hour Fuel Consumption (Gas) Max 44 m3 per hour Waste Combustion Chamber 2400 liters Post Combustion Chamber 1200 liters Oil Tank Capacity 500 liters Chimney 10.0 M Chamber Material Firebrick, Refractory Concrete Max. Heat Value 340,000 Kcal per hour Operation Technical Specification Solid Chamber Temperature 800 Deg. C – 1000 deg. C Gas Chamber Temperature 1000 Deg. C – 1200 deg. C Chamber Anti-Rate 1450 Deg. C Residency Time […]