Category: Blogs

Superfund Task Force Issues Final Report and Announces Plans to Continue Program Improvements Moving Forward Officials discussed progress at San Jacinto River Waste Pits site near Houston, Texas   Media contacts: Jennah Durant or Joe Hubbard, R6Press@epa.gov or 214 665-2200   DALLAS – (Sept. 9, 2019) Today, U.S. Environmental Protection Agency (EPA) Administrator Andrew Wheeler […]
waste incinerator 每天更新 ⋅ 2019年9月9日 新闻 Biodegradable plastic alternatives not necessarily better for Singapore, say experts CNA "In Singapore, waste is incinerated and not left in landfills to degrade. This means that the resource requirements of oxo-degradable bags are similar … 标记为不相关 Waterbeach waste plant fire: blaze expected to burn out over several days Cambridge Independent […]
waste incinerator 每天更新 ⋅ 2019年9月8日 新闻 As incinerator seeks permit renewal, air quality group holds 'zero waste' talk and workshop Glens Falls Post-Star Wheelabrator, the company that owns the trash plant, is 28 years old and is listed as one of the top polluting incinerators in the country, according to a … 标记为不相关 Kerbside bin changes […]
waste incinerator 每天更新 ⋅ 2019年9月7日 新闻 Olmsted County Preparing to Expand Kalmar Ash Landfill News Talk 1340 KROC-AM (press release) (blog) … Kalmar Landfall was specially designed to hold the ash generated by the Olmsted Waste-to-Energy Facility and the Mayo Medical Waste Incinerator. 标记为不相关 Will nationwide waste sorting solve China's landfill problem? South China Morning […]
US EPA Notice of New Litigation RE: Notice of Lawsuit Filed Against EPA – Sinclair Wyoming Refining Co. v. EPA, No. 19-9562 (10th Cir.) The U.S. Environmental Protection Agency has recently received a petition for review in the above-captioned case that may be of interest to you. This information is provided for your information only, and […]
US EPA Receives New NOI RE: New Notice of Intent to Sue EPA The U.S. Environmental Protection Agency has recently received a notice of intent to sue (NOI) that may be of interest to you. The Clean Air Act NOI is submitted pursuant to 42 U.S.C. § 7604(b)(2) for failure to review and revise certain […]
waste incinerator 每天更新 ⋅ 2019年9月6日 新闻 Dealing with sea spewing syringes, stolen hospital waste and inefficient incinerators DAWN.com The one day in the last five months that 17-year-old Abdul Rafiq decided to sleep in and not report for work, was the day he missed all the excitement … 标记为不相关 Rising demand on Surgical Waste Management Market […]
Technical specification for burning machine 1.Two systems are required to be installed in the south of the Kingdom of Saudi Arabia. The two systems will be used by custom authority to  burn different kinds of drugs. All need equipment must be provided. 2.Warrantee:  booth systems must be provided with 3 years warrantee from the date of acceptance. All needed spare parts, preventative  maintenance repair and corrective maintenance must be included in the cost and provided to the customer. 3.All needed electric and water connections must be provided. 4.Both systems must be of high quality and must be environmental friendly. 5.The capacity of each system should be up to 100 kg/hr. 6.The system must have automatic feeding. 7.Each system must consists of two burning  rooms, one primary room for burning the drug and another room for burning the gases  that emit as  a result of primary burning.  8.The oven must be made of steel that is rust resistance and with thickness not less than 6 mm. 9.Each system must be of high efficient in burning different kinds of drugs, and should have 99.9% efficiency for burning organic materials. 10.Waste products should not exceed 5%. 11.System must have automatic ignition system.  12.System should use diesel (HSD) as fuel and should not consume more than  8 to 10 lt/hr .  13.Each system should be provided with fuel tank  of size adequate to operate the system for one full day. 14.The temperature in the primary room should be 850 C ± 50 C. the system should also be capable to operate up to 1050 C ± 50 C. the system  should be capable of continues operation and should be provided with cement layer insulator with adequate thickness. 15.Oven should be provided with heat insulator to allow easy operation. 16.Gas should remain in the secondary room for not more than 1.5 second. 
waste incinerator 每天更新 ⋅ 2019年9月5日 新闻 Recycling 'may be burnt in waste incinerator' if no deal Brexit happens Gloucestershire Live Recycling such as plastic and paper may be burnt in Gloucestershire's waste incinerator if Britain leaves the European Union without a deal, a district … 标记为不相关 Relying on landfills is not an option The CT Mirror […]
waste incinerator 每天更新 ⋅ 2019年9月4日 新闻 Potential landfill expansion would nearly double truck traffic in Boyertown The Mercury Earl and Berks get $2 for each ton of waste dumped in the landfill. … Rolling Hills is authorized to accept municipal solid waste, incinerator ash, … 标记为不相关 Korean firms promote 'eco-friendly' incinerator in PHL pna.gov.ph TACLOBAN CITY […]