Logic Programmed Control of 2 Burners Range Of Pre-Set Burn Times Fuel Saving Burner Efficiency Control Program with Constantly Running Fans Temperature Monitoring With Separate Displays for Primary/ Secondary Chambers Auto Control Manual Control Timer Control 0-24 Hours Integral Fun Timer Control Operating Features Time to Temperature: 35 Minutes Fuel Consumption: Gas […]
INCINERATEUR DE DECHETS HOSPITALIER health center incinerator format SPECS TECHNIQUES. Capacité harmful de 55 Kg/h jour de déchets hospitaliers avec un p?. c. i jusqu’ à 3.200 Kcal/Kg 1) Kind de déchet hospitalier 2) Pouvoir calorifique inférieur 3.200 kcal/kg 3) Humidité 20%. 4) Teneur en cendres et/ou inertes 8%. 5) Capacité harmful nominale 55 kg/h. […]
1. Capability of damage in weight: 60 Kg/h. 2. It should be able to run very little less than 10 hours/day 3. This burner needs to have the ability to destroy all combustible wastes created by healthcare facilities, unique centers, research laboratories, institutes, and so forth. 4. Style Requirements: Kinds A, B, C, D, as […]
* scientific burners, The insulation of the burning chamber require to be made up of refractory bricks, having a. high web content of aluminium and likewise protects bricks in order to make sure a minimum temperature level on. the outdoors sheet metal. * Structure of the refractory; ? Refractory concrete:. ?. Density: ≥ 100 mm. […]
* Burner with gas, mono-bloc spreading helping kind with straight fire, lights as well as safety and safety of digital ignition, long-term ventilation, electro-magnetic sluice gate of plan and dividing shutoff. * An additional shot of air to ensure excellent oxygen material. 19. A control box guaranteeing the overall cycle of burning. 20. Fan: * […]
oElectro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of the automatic cycle. Controls and regulations: Control box watertight to dust, including: A switch circuit breaker for each engine (ventilators and burners). A timer with adjustable temporization for the regulation of each burner. […]
waste itself, running problems in the shed chamber (i.e. temperature degree, holding time as well as likewise disturbance) and also motorist capability. Waste having chlorinated materials (i.e. chlorinated solvents and plastics, PVC piping, lumber treated with pentachlorophenol or PCB-amended paint, aquatic driftwood) should be divided from different other waste as their burning will absolutely result […]
Petrol: diesel Consumption: 8-10liter/hour Capacity: to cremate (carrion and spoils) 350-400kg/hour Temperature: 900-1350?C Operation temperature: -30~40?C Incinerator weight: 1800-2000 kg Volume: 0.70-0.80m/cube Exterior dimension: 1.4-1.6*1.0-1.15m (L*W) A heater stands for a complete service to the problem of disposal of all clinical facility waste kinds. The fluid fuel is diesel. The burner ought to meet the […]
the following containerized incinerators. (Kitchen and accommodation and grey water and black water plant removing waste) we need incinerator is each function separate are all in one incinerator we need informed. Plant we installing for our accommodation barge used in an offshore marine construction project. 200 People would be accommodated onboard. WASTE INCINERATORS RECOMMENDATIONS china […]
Stack size shall be in accordance with the manufacturer’s recommendations. Stacks shall be the forced-air type and completely self-supporting and unattached to nearby structures. As a minimum, stack heights shall minimize downwash of stack emissions due to aerodynamic influences from nearby structures and be calculated in accordance with DoD 4715.05-G, Overseas Environmental […]