Day: April 23, 2021

Capability: 20KG/Hr, Temp Variety: 600 Deg. C– 1100 Deg. C Gas Supply: Natural Gas/Diesel Dual Burning Chamber Full Scrubbing System (Double Resultant Gas Washing Machine), Dual Blower, Chimney Elevation: 8m Electric Supply: 220/240Volt, Single Stage 1. Sort of waste: Garbage 2. Any type of other type: 3. Amount of waste produced daily in kg: (50 […]
Major components are– Ethanol, Paraffin, Silicon, Aluminium chloro hydrate, Bentone, LPG quote for incinerators for commercial chemical wastes therapy, 1 burning rate have to be Ordinary 30kgs/h 2 within chamber product must be refractory concrete cement 3 it operates in three system diesel oil/ Gas or LPG 4 voltage should be 220V 5 inside temperature […]
Heap: Type: Cord Supported MOC: Mild Steel of ISstd Elevation:3 Meters or even more – PROCESS AT THE VERY LEAST 1 METRIC LOTS OF WASTE PER DAY – OPERABLE BY 1 INDIVIDUAL, WITHOUT ANY TRAINING REQUIRED – REGULAR UPKEEP CONTAINER BE COMPLETED BY 1 PERSON WITH MINIMAL TRAINING – ROUTINE UPKEEP MUST NOT GO BEYOND […]
Primary Burning Chamber Waste Charging Door: Provided with refractory lining with sealing gaskets Ash Eliminated Door: Supplied with refractory lining with sealing gaskets External Body MOC: Mild Steel, 5mm Primary Chamber: Stainless-steel Running Temperature level:800. ± 50 ◦ C. Insulation: Insulation Block. Heating Elements Type: Kanthal Al Quality. Power Usage: 75 KW (First Tons ). […]
1. Is the house time more than 2 secs? 2. Is the main as well as additional air preheated? 3. Could it be provided as a continuous system? 4. Exists a surveillance system for functional parameter? (temperature). 5. Exists an information logging system? 6. Does it offer control interventions to change waste feed, grate rate, […]
Burning rate: 250 Kg/hr. It should be able to Operate not Less than 10 hours/day This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc… Design Specification: Types A, B, C, D, and E of medical waste “PYROLYTIC” combustion, by controlling the gasification of waste. The incinerator […]
TECHNICAL INCINERATORS SPECIFICATIONS FOR 2 medical facilities INTRO All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal […]
1) Policy – – Waste disposal administration will be taken unique note to prevent health center infection. – – Infections wastes shall be taken care of, stored purely and also burned by a burner situated at hospital site. 2) Waste Disposal Plan a)Classification – – Medical wastes in healthcare facility are categorized as follows; Infections Waste Specially-controlled […]
“PYROLYTIC” burning, by controlling the gasification of waste The incinerator producer should stay clear of the launch of black smoke as well as great dust, during the loadings. It will be able to reduce the quantity of wastes by 98%. It shall have the ability to hold discharge in the second shed with gas residence […]
The incinerator plant shall incorporate a control board for its procedure. On the control panel we will have a visual screen of the chamber temperature levels. This aesthetic display needs to manage and keep an eye on the burner as well as his performance. Capacity of destruction in weight will be 60 Kg/h. It must […]