CONTACT: Soledad Calvino (News Media Only) calvino.maria@epa.gov 415-972-3512 FOR IMMEDIATE RELEASE September 3, 2019 U.S. EPA awards close to $8 million to protect and restore San Francisco Bay and its watersheds SAN FRANCISCO – The U.S. Environmental Protection Agency (EPA) has awarded almost $8 million in grants to protect and restore wetlands and streams in […]
Spesifikasi Incinerator 200kg/jam Spesifikasi dan Daftar Material Dimensi dan Power Capacity Nama Barang : INCINERATOR Type / Model : PWR-INC-KMN 20 Kapasitas : 200kg/Jam (2 m3) Length : 384 cm Width : 182 cm Height : 213 cm Height of Chimney std : 700 cm TOTAL WEIGHT : 9.500 kg Panel – timer : Digital Included Auto Alarm Finishing : Hot endured paint Fuel tank : 200 Liter Covering Element from steel : 3-8mm Banyaknya Burner : 3 pcs Banyaknya Blower : 2 pcs Max. Fuel consumption : 15-40 Liter/Jam Max. Elektric consumption : 1300 Watt Bahan bakar : Kerosene / Diesel (solar) Voltage : 220 V / 1 phase / 50 Hz Material 1. PANEL CONTROL Type : Digital Buatan : Local KAMINE ( Panel dan Incinerator satu Merek) Voltage : 220 V / 1 phase / 50 Hz Safety operator : Emergency Stop System : Microkontroller Pengoperasian : Semi Automatic Temperatur control : Digital Coupler Type Control panel : Manual dan automatic Tipe : Self Standing Type / Wall Mounted Type Material : Mild steel Thermocontrol : 2 (Dua) 1200 ºC Set of timer : 0- 2 jam Tombol saklar […]
The waste will be reduced by 90~95% to leave 10 -5% ash 2.4 Quality/Environmental Standards NEMA ACT (EMCA) 1999 BS3316 2.5 Operating Period Anticipated daily operating period 8 hours Maximum operating period 12 hours 2.6 Chamber Should be refractory lined to the following standard; Hearth and lower section of chamber walls 2.7 Hot face material Super duty firebrick Limiting continuous service limit 1500°C Thickness 100mm Thermal conductivity 1.3 W/mk 2.8 Insulation Calcium silicate Limiting continuous service limit 1000°C Thickness 25mm Should be manufactured from refractory lined mild steel or high quality air-cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level. 2.10 Ignition Burners Fully packaged oil type, complete with electric ignition and flame failure controls, wired with continuous running fan and complete with all valves, fan and motor. • Maximum rating: at least 450kW/hour • Burner: arranged for on/off operation • Maximum consumption: at least 6 litres/hour • Average consumption: at least 3 litres/hour […]
The incinerator should be a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner. It should employ a temperature based logic control system to provide optimum control of the operating conditions and incorporate a high capacity thermal oxidizing secondary chamber. It should be designed to retain the exhaust gases, for at least 2 seconds to ensure the unit’s effective destruction of the combustion products. i. Waste type Health care waste ii. Waste density 125 to 350Kg/M3 iii.. Waste Calorific Value 4000 KCAL/Kg iv. Moisture content 10-25% v. Estimated ash residue 5-10% vi. Nominal capacity 50Kg/hour batch load vii. Secondary chamber 2 seconds @ 850°C The primary combustion chamber is the main structure of the incinerator, fabricated from mild steel plate and stiffened with rolled steel sections. It is carried from the floor level on a substantial steel support frame. Internally the shell is lined with calcium silicate insulation and a hot face combination of super duty brickwork or high strength castable. The primary combustion chamber must ensure minimum exit temperature is not less than 850°C. One Manual Load Incinerator comprising: • Manual Loading door • Horizontal solid hearth, refractory lined primary combustion chamber. Approximate dimensions 800 mm diameters x 2100mm long • Full sized bulk load/ash removal door • 1 off diesel-fired ignition burner — temperature controlled • 1 off combustion air supply fan and distribution system, automatic control • High capacity secondary combustion chamber with residence time not less than 2 seconds @ >850°C • 1 off diesel-fired afterburner — temperature controlled […]
waste incinerator 每天更新 ⋅ 2019年9月3日 新闻 Visionary leadership on solid waste sorely needed The CT Mirror Last month, the Hartford City Council passed a resolution opposing any continued operation, refurbishment or redevelopment of a trash incinerator … 标记为不相关 Sheffield trials waste-powered bin lorries to clean up streets BBC News They will be charged using power generated […]