Day: August 23, 2019

waste incinerator 每天更新 ⋅ 2019年8月23日 新闻 Mainers had questions about what's going to happen to your trash. Here are the answers. WGME Instead, trash and recyclables will go into the same bin — no need to … communities now pay to dispose of their waste at the Orrington incinerator. 标记为不相关 Council 'strongly objects' to Corby […]
INCINERATOR 20KG General Specifications 6mm plate steel sheel construction 11cm 1400 º C Refractory L iner Temperature controlled Burners Secondary combustion Burners Interlock Switch on Load Doors Separate Ash Door One Second secondary Residence @ 1000 º C 400 ° C Silicone Based Paint Finish. Alloy Temperature Sensor Factory wired and tested Capacity-20 kg / hr Primary Chamber-1607 L Hearth Area-1:36 sq. m Secondary Chamber-694 L Primary Burner (oil)-420,000 btu Secondary Burner (oil)-900,000 btu secondary Combustion-1/6 hp Exhaust Stack-46cm x 6m Electrical Service-220/50 Weight System-5.700 kg Dimension “D”-152cm Load Port Height- 60x 60 cm Ash Port Height -36 x 36 cm Electrically operated incinerator In a simple design with a metal steel drum electric. including:  A cage for receipt of biomedical waste;  A combustion chamber with fireplace with a filter to retain ashes;  A cover;  An air supply; A turbine  allowing the supply of the air. Combustion temperature: 1800 ° C. Compliance with European standards. Comes with all necessary accessories