Day: July 27, 2019

Type Pyrolytic:- Hot Medical Waste Disposing Machine Operation Condition 8-16 Hr /day Controls Built in data recording Incinerator  /Primary Combustion Chamber Type: continuous loading  Capacity/Burn rate per hour: 250 -300kg/hr  Temperature:  900-1200 oC   Material: External- 3 layers  Internal lining:  a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shock Secondary  Combustion  Chamber Type: horizontal/vertical Temperature: 1200-1400 oC Residence time of gases : >2 seconds Material External- Low thermal mass insulation 14-30 oC  Internal lining:  a fire proof material of pre-fired refractory bricks with Aluminium nettle lining, resistant to corrosive waste or gas and to thermal shock. Ash Handling System Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash. Flue gas treatment   system         Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc.  Auxiliary device: Fuel cut off device Waste  feeding mechanism Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800L at a time                                                                                                                                       Chimney (Stack) Type: Vertical type height: 7-10 meters  Material: Fireproof cast, stainless steel  Wet scrubbing system Vertical sprat tower with baffles or packing inside Gas emission Reduction of Pollutant gas SO2, HCL, HF and line particulate OUTPUT ASH -Max <5% of original waste size GAS- SMOKELESS,ODORLESS Emission standard WHO/ European Test report for emission testing Must be provided Product Data sheet/ Catalogue Must be attached to the ITB Additional Requirement -Local agent or branch in Ethiopia -Training for users as well as for EPHI maintenance staff  on preventive maintenance […]
waste incinerator 每天更新 ⋅ 2019年7月27日 新闻 Corpn.: no waste to be sent to dumpyards after Dec. 2020 The Hindu “We will also develop facilities to generate bio CNG from waste at three locations. A dry waste incinerator will be developed in Manali to process 10 … 标记为不相关 Penang 'considering proposals' for incinerator waste disposal EdgeProp.my GEORGE […]