{"id":61725,"date":"2022-02-28T11:29:25","date_gmt":"2022-02-28T11:29:25","guid":{"rendered":"https:\/\/www.njctw.com\/?p=1224"},"modified":"2022-02-28T11:29:25","modified_gmt":"2022-02-28T11:29:25","slug":"biomedical-waste-heater-10-15-kg-5","status":"publish","type":"post","link":"https:\/\/3w.haiwo.net\/en\/biomedical-waste-heater-10-15-kg-5\/","title":{"rendered":"Biomedical Waste Heater, 10-15 KG."},"content":{"rendered":"<div class=\"topad\">\n<script async=\"async\" src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script><\/p>\n<p><ins class=\"adsbygoogle\" style=\"display:block\" data-ad-client=\"ca-pub-1829112754459959\" data-ad-slot=\"3991149636\" data-ad-format=\"auto\"><\/ins><br \/>\n<script>\n<![CDATA[\n(adsbygoogle = window.adsbygoogle || []).push({});\n]]>\n<\/script><\/p>\n<\/div>\n<p>The first is a small<br \/>\n20kg\/per hr incinerator for a small-medium sized hospital, and the<br \/>\nsecond is a 500kg per\/hr incinerator for a company planning to start a<br \/>\nincineration service in Lahore.Burn Rate : &gt;200 kg per hour<br \/>\nAverage fuel consumption : ~29 kg per hour ( Or lesser)<br \/>\nGas Retention in Secondary Chamber : 2 secs<br \/>\nTemperature Monitoring : Yes<br \/>\nAverage Ash Residue : 3%Medical waste management practises here are sub-standard. I have come across your small scale medical waste management units.Biomedical&nbsp;Waste&nbsp;Incinerator,&nbsp;10-15&nbsp;kg<br \/>\nManufacturer:<br \/>\nBrand:<br \/>\nType&nbsp;\/&nbsp;Model:<br \/>\nCountry&nbsp;of&nbsp;Origin:<br \/>\nDescription&nbsp;of&nbsp;Function<br \/>\nThe&nbsp;Biomedical&nbsp;Waste&nbsp;Incinerator&nbsp;is&nbsp;used&nbsp;for&nbsp;Incineration&nbsp;of&nbsp;each&nbsp;type&nbsp;of&nbsp;Biomedical&nbsp;Waste.<br \/>\nThe&nbsp;Disposal&nbsp;of&nbsp;such&nbsp;Biomedical&nbsp;waste&nbsp;is&nbsp;a&nbsp;very&nbsp;important&nbsp;as&nbsp;it&nbsp;is&nbsp;a&nbsp;dangerous&nbsp;wastes&nbsp;for<br \/>\nhuman&nbsp;life,&nbsp;and&nbsp;It&nbsp;is&nbsp;only&nbsp;possible&nbsp;with&nbsp;a&nbsp;perfect&nbsp;incinerator.<br \/>\nOperational&nbsp;Requirements<br \/>\nIt&nbsp;shall&nbsp;be&nbsp;operated&nbsp;by&nbsp;manual&nbsp;and&nbsp;automated&nbsp;mode.<br \/>\nThe&nbsp;combustion&nbsp;efficiency&nbsp;(CE)&nbsp;shall&nbsp;be&nbsp;at&nbsp;least&nbsp;99.00%.<br \/>\nThe&nbsp;combustion&nbsp;efficiency&nbsp;is&nbsp;computed&nbsp;as&nbsp;follows:<br \/>\nC.E.=&nbsp;__%CO2______&nbsp;x&nbsp;100<br \/>\n%CO2&nbsp;+&nbsp;%CO<br \/>\nEmission&nbsp;Standards:&nbsp;Lower&nbsp;emission&nbsp;rates&nbsp;are&nbsp;preferred.<br \/>\nParameters&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Concentration&nbsp;in&nbsp;mg\/Nm3&nbsp;(12%&nbsp;CO2&nbsp;correction<br \/>\nMax&nbsp;total&nbsp;dust&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;30mg\/m3<br \/>\nMax&nbsp;Sulphur&nbsp;Dioxide&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;200mg\/m3<br \/>\nMax&nbsp;Nitrogen&nbsp;dioxide&nbsp;&nbsp;&nbsp;&nbsp;400mg\/m3<br \/>\nMax&nbsp;Carbon&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;100mg\/m3<br \/>\nMonoxide<br \/>\nMinimum&nbsp;stack&nbsp;height&nbsp;shall&nbsp;be&nbsp;30&nbsp;metres&nbsp;above&nbsp;ground.<br \/>\nVolatile&nbsp;organic&nbsp;compounds&nbsp;in&nbsp;ash&nbsp;shall&nbsp;not&nbsp;be&nbsp;more&nbsp;than&nbsp;0.01%.<br \/>\nSystem&nbsp;Configuration<br \/>\nBiomedical&nbsp;Waste&nbsp;Incinerator,&nbsp;complete&nbsp;unit.<br \/>\nTechnical&nbsp;Specifications<br \/>\nIncinerator:<br \/>\nIt&nbsp;shall&nbsp;be&nbsp;Electrical&nbsp;or&nbsp;Diesel&nbsp;Fired&nbsp;Incinerator&nbsp;or&nbsp;Controlled&nbsp;Air&nbsp;&amp;&nbsp;pyrolytic.<br \/>\nType&nbsp;of&nbsp;Waste:&nbsp;Biomedical&nbsp;Waste<br \/>\nIt&nbsp;shall&nbsp;have&nbsp;burning&nbsp;capacity&nbsp;10-15&nbsp;kg\/hr.<br \/>\nFuel:&nbsp;Diesel<br \/>\nBurner:&nbsp;Monoblock&nbsp;fully&nbsp;automatic&nbsp;burners.<br \/>\nTemperature:&nbsp;Primary&nbsp;Chamber&nbsp;800&nbsp;\u00b1&nbsp;50&nbsp;oC,&nbsp;Secondary&nbsp;Chamber&nbsp;1050&nbsp;\u00b1&nbsp;50&nbsp;oC.<br \/>\nType&nbsp;of&nbsp;Waste:&nbsp;Biomedical&nbsp;waste&nbsp;with&nbsp;moisture&nbsp;content&nbsp;up&nbsp;to&nbsp;85%.<br \/>\nDestruction&nbsp;Efficiency:&nbsp;99%.<br \/>\nIt&nbsp;shall&nbsp;have&nbsp;separate&nbsp;digital&nbsp;display&nbsp;of&nbsp;temperature&nbsp;for&nbsp;both&nbsp;chambers.<br \/>\nIt&nbsp;shall&nbsp;have&nbsp;provision&nbsp;for&nbsp;measuring&nbsp;primary&nbsp;&amp;&nbsp;secondary&nbsp;chamber&nbsp;temperatures&nbsp;using&nbsp;external<br \/>\nthermo&nbsp;coupler.<br \/>\nSecondary&nbsp;chamber&nbsp;gas&nbsp;residence&nbsp;time&nbsp;shall&nbsp;be&nbsp;minimum&nbsp;1&nbsp;second&nbsp;at&nbsp;1050&nbsp;oC.<br \/>\nPrimary&nbsp;Chamber:<br \/>\nType:&nbsp;Static&nbsp;Solid&nbsp;Hearth<br \/>\nMaterial&nbsp;of&nbsp;Construction:&nbsp;Mild&nbsp;Steel,&nbsp;5mm&nbsp;thick<br \/>\nRefractory&nbsp;thickness:&nbsp;approx.115mm&nbsp;thick<br \/>\nMaterial:&nbsp;Refractory&nbsp;bricks&nbsp;confirming&nbsp;to&nbsp;international&nbsp;standard.<br \/>\nTemperature&nbsp;resistance:&nbsp;1400&nbsp;oC<br \/>\nInsulation&nbsp;thickness:&nbsp;approx.115mm&nbsp;thick<br \/>\nMaterial:&nbsp;Insulation&nbsp;bricks&nbsp;confirming&nbsp;to&nbsp;international&nbsp;standard.<br \/>\nWaste&nbsp;Charging:&nbsp;Manual&nbsp;&amp;&nbsp;Automatic&nbsp;waste&nbsp;charging.<br \/>\nAsh&nbsp;Removal:&nbsp;Manual\/automatic<br \/>\nSecondary&nbsp;Chamber:<br \/>\nType&nbsp;:&nbsp;Static&nbsp;Solid&nbsp;Hearth<br \/>\nMaterial&nbsp;of&nbsp;Construction:&nbsp;Mild&nbsp;Steel,&nbsp;5mm&nbsp;thick<br \/>\nRefractory&nbsp;thickness:&nbsp;approx.115mm&nbsp;thick<br \/>\nMaterial:&nbsp;Refractory&nbsp;bricks&nbsp;confirming&nbsp;to&nbsp;international&nbsp;standard.<br \/>\nTemperature&nbsp;resistance:&nbsp;1400&nbsp;oC.<br \/>\nInsulation&nbsp;thickness:&nbsp;approx.115mm<br \/>\nMaterial:&nbsp;Insulation&nbsp;bricks&nbsp;confirming&nbsp;to&nbsp;international&nbsp;standard.<br \/>\nWaste&nbsp;Charging:&nbsp;Manual&nbsp;&amp;&nbsp;Automatic&nbsp;waste&nbsp;charging.<br \/>\nEmergency&nbsp;Stack:<br \/>\nType:&nbsp;cylindrical,&nbsp;top&nbsp;mounted&nbsp;on&nbsp;venturi&nbsp;ejector.<br \/>\nMaterial&nbsp;of&nbsp;Construction:&nbsp;Mild&nbsp;Steel,&nbsp;3mm&nbsp;thick.<br \/>\nRefractory:&nbsp;75mm&nbsp;thick&nbsp;castable.<br \/>\nInsulation:&nbsp;25mm&nbsp;thick&nbsp;castable.<br \/>\nQuencher:<br \/>\nMaterial&nbsp;of&nbsp;construction&nbsp;of&nbsp;outer&nbsp;body:&nbsp;Mild&nbsp;Steel&nbsp;refractory&nbsp;lined&nbsp;from&nbsp;inside.<br \/>\nShall&nbsp;have&nbsp;water&nbsp;circulation&nbsp;system&nbsp;with&nbsp;centrifugal&nbsp;pump.<br \/>\nIt&nbsp;shall&nbsp;have&nbsp;to&nbsp;reduce&nbsp;flue&nbsp;gas&nbsp;temperature&nbsp;before&nbsp;venturi&nbsp;scrubber.<br \/>\nShall&nbsp;provide&nbsp;pump&nbsp;motor&nbsp;of&nbsp;suitable&nbsp;capacity.<br \/>\nAir&nbsp;Pollution&nbsp;Control&nbsp;Device&nbsp;\u2013&nbsp;Venturi&nbsp;Scrubber<br \/>\nType:&nbsp;High&nbsp;pressure&nbsp;jet&nbsp;type.<br \/>\nMOC:&nbsp;Stainless&nbsp;steel&nbsp;\u2013&nbsp;316L.<br \/>\nTemperature&nbsp;at&nbsp;the&nbsp;outlet:&nbsp;78-80&nbsp;oC<br \/>\nScrubbing&nbsp;Media:&nbsp;Water&nbsp;with&nbsp;5%&nbsp;caustic<br \/>\nRe-&nbsp;Circulation&nbsp;Pump&nbsp;for&nbsp;Venturi&nbsp;Scrubber<br \/>\nType:&nbsp;Centrifugal<br \/>\nApplication:&nbsp;PP\/SS<br \/>\nPiping&nbsp;:&nbsp;PPR<br \/>\nDroplet&nbsp;Separator&nbsp;&amp;&nbsp;Re-Circulation&nbsp;Tank&nbsp;(Integral)<br \/>\nType:&nbsp;Cyclonic<br \/>\nApplication:&nbsp;To&nbsp;separate&nbsp;water&nbsp;droplets&nbsp;from&nbsp;flue&nbsp;gases<br \/>\nMaterial&nbsp;of&nbsp;Construction:&nbsp;Mild&nbsp;Steel&nbsp;Rubber&nbsp;lined&nbsp;3mm&nbsp;thick<br \/>\nI.D.&nbsp;Fan:<br \/>\nType:&nbsp;High&nbsp;pressure&nbsp;centrifugal<br \/>\nMaterial&nbsp;of&nbsp;Construction:&nbsp;Stainless&nbsp;steel&nbsp;304,&nbsp;impeller&nbsp;and&nbsp;mild&nbsp;steel&nbsp;rubber&nbsp;lined&nbsp;casting<br \/>\nDrive:&nbsp;Bel<br \/>\nCombustion&nbsp;Fan:<br \/>\nType:&nbsp;Centrifugal<br \/>\nModulation:&nbsp;Manual&nbsp;damper&nbsp;control<br \/>\nMaterial&nbsp;of&nbsp;Construction:&nbsp;Mild&nbsp;Steel<br \/>\nDrive:&nbsp;Direct&nbsp;drive<br \/>\nBurners:<br \/>\nNo.&nbsp;of&nbsp;burners:&nbsp;2&nbsp;Nos.&nbsp;(1&nbsp;No.&nbsp;in&nbsp;Primary&nbsp;Chamber&nbsp;and&nbsp;1No.&nbsp;in&nbsp;Secondary&nbsp;Chamber)<br \/>\nType:&nbsp;Monoblock&nbsp;fully&nbsp;automatic<br \/>\nFuel:&nbsp;Diesel<br \/>\nFuel&nbsp;Oil&nbsp;Storage&nbsp;Tank:<br \/>\nShall&nbsp;provide&nbsp;suitable&nbsp;capacity&nbsp;of&nbsp;oil&nbsp;storage&nbsp;tank.<br \/>\nMaterial&nbsp;of&nbsp;Construction:&nbsp;Mild&nbsp;steel.<br \/>\nFacility&nbsp;for&nbsp;visual&nbsp;checking&nbsp;of&nbsp;fuel&nbsp;shall&nbsp;be&nbsp;there.<br \/>\nIt&nbsp;shall&nbsp;have&nbsp;diesel&nbsp;consumption&nbsp;monitoring&nbsp;system.<br \/>\nIt&nbsp;shall&nbsp;come&nbsp;with&nbsp;diesel&nbsp;oil&nbsp;level&nbsp;indicator,&nbsp;piping&nbsp;with&nbsp;valves&nbsp;&amp;&nbsp;N.R.&nbsp;valve.<br \/>\nControl&nbsp;Panel:<br \/>\nType:&nbsp;Manual&nbsp;&amp;&nbsp;Automated&nbsp;PLC&nbsp;based&nbsp;control&nbsp;panel&nbsp;with&nbsp;printer&nbsp;&amp;&nbsp;recording&nbsp;device.<br \/>\nMaterial&nbsp;of&nbsp;Construction:&nbsp;CRCA&nbsp;sheet<br \/>\nIt&nbsp;shall&nbsp;have&nbsp;digital&nbsp;temperature&nbsp;controller.<br \/>\nEpoxy&nbsp;powder&nbsp;coated&nbsp;washable&nbsp;paint&nbsp;finish.<br \/>\nIt&nbsp;shall&nbsp;have&nbsp;audio-visual&nbsp;alarm&nbsp;system.<br \/>\nChimney&nbsp;of&nbsp;30&nbsp;meters&nbsp;Height:<br \/>\nMaterial&nbsp;of&nbsp;Construction:&nbsp;Mild&nbsp;Steel<br \/>\nIt&nbsp;shall&nbsp;be&nbsp;self-supporting&nbsp;type.<br \/>\nHeight&nbsp;shall&nbsp;be&nbsp;30&nbsp;meters&nbsp;from&nbsp;ground&nbsp;level.<br \/>\nPaint&nbsp;The&nbsp;chimney&nbsp;is&nbsp;painted&nbsp;externally&nbsp;with&nbsp;two&nbsp;coats&nbsp;of&nbsp;heat&nbsp;resistant&nbsp;aluminum&nbsp;paint<br \/>\nShall&nbsp;provide&nbsp;ladder&nbsp;till&nbsp;the&nbsp;top.<br \/>\nIt&nbsp;shall&nbsp;have&nbsp;3mm&nbsp;thick&nbsp;rubber&nbsp;lining&nbsp;from&nbsp;inside&nbsp;for&nbsp;protection.<br \/>\nIt&nbsp;shall&nbsp;come&nbsp;with&nbsp;aviation&nbsp;lamp,&nbsp;lightening&nbsp;arrestor,&nbsp;stack,&nbsp;drain,&nbsp;inspection&nbsp;platform,&nbsp;sampling<br \/>\nport.<br \/>\nConsumption&nbsp;certificate:<br \/>\nThe&nbsp;bidder&nbsp;must&nbsp;submit&nbsp;diesel&nbsp;consumption&nbsp;for&nbsp;a&nbsp;daily&nbsp;operation&nbsp;of&nbsp;6&nbsp;hours.<br \/>\nTurnkey:<br \/>\nPrices&nbsp;offered&nbsp;shall&nbsp;be&nbsp;inclusive&nbsp;of&nbsp;all&nbsp;civil&nbsp;works,&nbsp;electrical&nbsp;requirements&nbsp;including&nbsp;cabling&nbsp;and<br \/>\nswitches&nbsp;required&nbsp;for&nbsp;installation&nbsp;&amp;&nbsp;commissioning&nbsp;of&nbsp;the&nbsp;equipment.<br \/>\nBidder&nbsp;shall&nbsp;submit&nbsp;detail&nbsp;drawings,&nbsp;design,&nbsp;and&nbsp;layout&nbsp;plan&nbsp;of&nbsp;civil&nbsp;works.<br \/>\nThe&nbsp;bidder&nbsp;shall&nbsp;submit&nbsp;the&nbsp;details&nbsp;of&nbsp;BOQ&nbsp;of&nbsp;civil&nbsp;and&nbsp;electrical&nbsp;works.<br \/>\nAccessories,&nbsp;spares&nbsp;and&nbsp;consumables<br \/>\nAll&nbsp;standard&nbsp;accessories,&nbsp;consumables&nbsp;and&nbsp;parts&nbsp;required&nbsp;to&nbsp;operate&nbsp;the&nbsp;equipment,&nbsp;including<br \/>\nall&nbsp;standard&nbsp;tools&nbsp;and&nbsp;cleaning&nbsp;and&nbsp;lubrication&nbsp;materials,&nbsp;to&nbsp;be&nbsp;included&nbsp;in&nbsp;the&nbsp;offer.&nbsp;Bidders<br \/>\nmust&nbsp;specify&nbsp;the&nbsp;quantity&nbsp;of&nbsp;every&nbsp;item&nbsp;included&nbsp;in&nbsp;their&nbsp;offer&nbsp;(including&nbsp;items&nbsp;not&nbsp;specified<br \/>\nabove).<br \/>\nOperating&nbsp;Environment<br \/>\nThe&nbsp;system&nbsp;offered&nbsp;shall&nbsp;be&nbsp;designed&nbsp;to&nbsp;store&nbsp;and&nbsp;to&nbsp;operate&nbsp;normally&nbsp;under&nbsp;the&nbsp;conditions&nbsp;of<br \/>\nthe&nbsp;purchaser\u2019s&nbsp;country.&nbsp;The&nbsp;conditions&nbsp;include&nbsp;Power&nbsp;Supply,&nbsp;Climate,&nbsp;Temperature,<br \/>\nHumidity,&nbsp;etc.<br \/>\nPower&nbsp;supply:&nbsp;220-240&nbsp;VAC,&nbsp;50Hz&nbsp;single&nbsp;phase\/400&nbsp;\u2013&nbsp;420&nbsp;VAC,&nbsp;50Hz&nbsp;three&nbsp;phase&nbsp;as<br \/>\nappropriate&nbsp;fitted&nbsp;with&nbsp;appropriate&nbsp;plug.&nbsp;The&nbsp;power&nbsp;cable&nbsp;must&nbsp;be&nbsp;at&nbsp;least&nbsp;3&nbsp;meter&nbsp;in&nbsp;length.<br \/>\nStandards&nbsp;and&nbsp;Safety&nbsp;Requirements<br \/>\nIt&nbsp;shall&nbsp;have&nbsp;approval&nbsp;of&nbsp;\u201cPollution&nbsp;Control&nbsp;Board\u201d&nbsp;of&nbsp;purchaser\u2019s&nbsp;country.<br \/>\nAll&nbsp;mandatory&nbsp;approvals&nbsp;required&nbsp;for&nbsp;the&nbsp;installation&nbsp;and&nbsp;operation&nbsp;of&nbsp;incinerator&nbsp;shall&nbsp;be&nbsp;done<br \/>\nby&nbsp;the&nbsp;bidder.<br \/>\nMust&nbsp;submit&nbsp;ISO&nbsp;9001&nbsp;AND<br \/>\nCE&nbsp;or&nbsp;USFDA&nbsp;approved&nbsp;product&nbsp;certificate.<br \/>\nUser&nbsp;Training<br \/>\nMust&nbsp;provide&nbsp;user&nbsp;training&nbsp;(including&nbsp;how&nbsp;to&nbsp;use&nbsp;and&nbsp;maintain&nbsp;the&nbsp;equipment).<br \/>\nWarranty<br \/>\nComprehensive&nbsp;warranty&nbsp;for&nbsp;2&nbsp;years&nbsp;after&nbsp;acceptance.<br \/>\nMaintenance&nbsp;Service&nbsp;during&nbsp;Warranty&nbsp;Period<br \/>\nDuring&nbsp;the&nbsp;warranty&nbsp;period&nbsp;supplier&nbsp;must&nbsp;ensure&nbsp;preventive&nbsp;maintenance&nbsp;along&nbsp;with<br \/>\ncorrective\/breakdown&nbsp;maintenance&nbsp;whenever&nbsp;required.<br \/>\nInstallation&nbsp;and&nbsp;Commissioning<br \/>\nThe&nbsp;bidder&nbsp;must&nbsp;arrange&nbsp;for&nbsp;the&nbsp;equipment&nbsp;to&nbsp;be&nbsp;installed&nbsp;and&nbsp;commissioned&nbsp;by&nbsp;certified&nbsp;or<br \/>\nqualified&nbsp;personnel;&nbsp;any&nbsp;prerequisites&nbsp;for&nbsp;installation&nbsp;to&nbsp;be&nbsp;communicated&nbsp;to&nbsp;the&nbsp;purchaser&nbsp;in<br \/>\nadvance,&nbsp;in&nbsp;detail.<br \/>\nDocumentation<br \/>\nUser&nbsp;(Operating)&nbsp;manual&nbsp;in&nbsp;English.<br \/>\nService&nbsp;(Technical&nbsp;\/&nbsp;Maintenance)&nbsp;manual&nbsp;in&nbsp;English<br \/>\nList&nbsp;of&nbsp;important&nbsp;spare&nbsp;parts&nbsp;and&nbsp;accessories&nbsp;with&nbsp;their&nbsp;part&nbsp;number&nbsp;and&nbsp;costing.<br \/>\nCertificate&nbsp;of&nbsp;calibration&nbsp;and&nbsp;inspection&nbsp;from&nbsp;factory.<\/p>\n<div class=\"bottomad\">\n<script async=\"async\" src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script><\/p>\n<p><ins class=\"adsbygoogle\" style=\"display:block\" data-ad-client=\"ca-pub-1829112754459959\" data-ad-slot=\"3991149636\" data-ad-format=\"auto\"><\/ins><br \/>\n<script>\n<![CDATA[\n(adsbygoogle = window.adsbygoogle || []).push({});\n]]>\n<\/script><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The first is a small 20kg\/per hr incinerator for a small-medium sized hospital, and the second is a 500kg per\/hr incinerator for a company planning to start a incineration service in Lahore.Burn Rate : &gt;200 kg per hour Average fuel consumption : ~29 kg per hour ( Or lesser) Gas Retention in Secondary Chamber : [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[]},"categories":[6],"tags":[27],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/3w.haiwo.net\/en\/wp-json\/wp\/v2\/posts\/61725"}],"collection":[{"href":"https:\/\/3w.haiwo.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/3w.haiwo.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/3w.haiwo.net\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/3w.haiwo.net\/en\/wp-json\/wp\/v2\/comments?post=61725"}],"version-history":[{"count":0,"href":"https:\/\/3w.haiwo.net\/en\/wp-json\/wp\/v2\/posts\/61725\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/3w.haiwo.net\/en\/wp-json\/wp\/v2\/menu-items\/14"}],"wp:attachment":[{"href":"https:\/\/3w.haiwo.net\/en\/wp-json\/wp\/v2\/media?parent=61725"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/3w.haiwo.net\/en\/wp-json\/wp\/v2\/categories?post=61725"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/3w.haiwo.net\/en\/wp-json\/wp\/v2\/tags?post=61725"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}